MCC Kiosk

The Brief:

A customer approached MCL to manufacture and install a MCC kiosk and a kiosk for a sludge thickening plant for the same project. The scope of the project was to manufacture and deliver both kiosks.

The Solution:

Due to the kiosk for the sludge thickening plant being in excess of 6 meters deep it was delivered flat pack and assembled on site by the MCL Installation Team.

The Results:

All ventilation and heating calculations were undertaken by MCL utilising the data provided by the customer. MCL satisfied all the relevant Health and Safety Requirements for Site Installation.