The Brief:

A customer approached MCL to manufacture and install a housing 14.8m W x 5.7m D x 3.5m C.I.H. The scope of the project was manufacture, delivery in ­flat pack, erect on site (providing all relevant Health and Safety documentation) and equip with electrics.

The Solution:

Site assembly was carried out by the MCL Installation Team who hold the following certifications: - SSSTS Supervisor; CSCS Operators; Clean Water Hygiene Cards; Working at Height. All ventilation and heating calculations were undertaken by MCL utilising the data provided by the customer.

The Results:

All ventilation and heating calculations were undertaken by MCL utilising the data provided by the customer. MCL satisfied all the relevant Health and Safety Requirements for Site Installation.