Skip To Content
Get a Quote

Roof Fix Down

The Brief:

A customer approached MCL for a solution to house their lift equipment on a roof. The kiosk had to conform with building regulation insulation properties and be capable of being lifted by crane on to a 5 storey roof top.

The Solution:

 MCL manufactured a kiosk with a “U” Value of 0.15W/m2/oC and had all the lifting attachment points certificated for the lift. MCL attended site and undertook the fix down of the kiosk for the client – providing all necessary certification and health and safety paperwork.

The Results:

MCL satisfied all the relevant Health and Safety Requirements for Site Installation.